A platform for research: civil engineering, architecture and urbanism
Office building keeps pace -- Installs complete air conditioning
Fidelity-Philadelphia Trust building is 377 ft high above street and covers 600,000 sq ft, of steel frame construction with brick exterior walls; in basement, three centrifugal compressors develop 2500 tons of refrigeration, one driven by 500-hp wound rotor and two by 1000-hp squirrel cage motors; penthouses on roof contain air handling equipment.
Office building keeps pace -- Installs complete air conditioning
Fidelity-Philadelphia Trust building is 377 ft high above street and covers 600,000 sq ft, of steel frame construction with brick exterior walls; in basement, three centrifugal compressors develop 2500 tons of refrigeration, one driven by 500-hp wound rotor and two by 1000-hp squirrel cage motors; penthouses on roof contain air handling equipment.
Office building keeps pace -- Installs complete air conditioning
Heating, Piping Air Conditioning
Bricker, J. (author)
1955
16 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2003
Engineering Index Backfile | 1952
|Hospital installs radiant conditioning system
Engineering Index Backfile | 1938
|MARKET DATA - Multifamily sector keeps pace
Online Contents | 2003
Hospital installs radiant conditioning system
Engineering Index Backfile | 1938
|