A platform for research: civil engineering, architecture and urbanism
Cellular concrete floors wired easily
Construction of 210,000 sq ft electrified floor at National Cash Register plant in Dayton, Ohio; units have 6×16 in. cross section and typical length of 20 ft; every fifth unit had steel plates embedded so that slab could be tied to steel frame of building; floors were laid at rate of 4000 sq ft per day.
Cellular concrete floors wired easily
Construction of 210,000 sq ft electrified floor at National Cash Register plant in Dayton, Ohio; units have 6×16 in. cross section and typical length of 20 ft; every fifth unit had steel plates embedded so that slab could be tied to steel frame of building; floors were laid at rate of 4000 sq ft per day.
Cellular concrete floors wired easily
Eng News -- Rec
Engineering News-Record ; 158
1957
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1887
|Engineering Index Backfile | 1900
|CONCRETE FLOORS - Floors for cold stores
Online Contents | 2003
|Fire tests of precast cellular concrete floors and roofs
TIBKAT | 1962
|Fire tests of precast cellular concrete floors and roofs
UB Braunschweig | 1962
|