A platform for research: civil engineering, architecture and urbanism
Design and construction of transport ferry terminal
General arrangement of ferry terminal in Dublin Harbor, Ireland; fixed "hard" consists of 50 ft long, 14 ft 10 in. wide concrete ramp, at gradient of 1 in 10, lower end of ramp being at level of 14.00 Port Datum; movable bridge is 45 ft, 5 1/2 in. long and has roadway width of 12 ft; hinged end of bridge is supported by seven piles, driven to minus 31.6 PD.
Design and construction of transport ferry terminal
General arrangement of ferry terminal in Dublin Harbor, Ireland; fixed "hard" consists of 50 ft long, 14 ft 10 in. wide concrete ramp, at gradient of 1 in 10, lower end of ramp being at level of 14.00 Port Datum; movable bridge is 45 ft, 5 1/2 in. long and has roadway width of 12 ft; hinged end of bridge is supported by seven piles, driven to minus 31.6 PD.
Design and construction of transport ferry terminal
Instn Civ Engrs Ireland -- Trans
Smyth, M.C. (author)
1957
13 pages
5 Plates
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 1993
|Yokohama Ferry Terminal (Projekt)
British Library Online Contents | 2002
Yokohama Ferry Terminal (Projekt)
Online Contents | 2002
Construction of municipal ferry terminal at St. George, Staten Island
Engineering Index Backfile | 1949
|Downtown Ferry Terminal, San Francisco
British Library Conference Proceedings | 1998
|