A platform for research: civil engineering, architecture and urbanism
Scheduling equipment for Great Lakes channel dredging
Connecting channels authorized to be deepened total 168 mi; total amount to be moved is 18,500,000 cu yd by hydraulic dredge and 28, 500,000 cu yd by other dredges includes 1 ft to pay overdepth of 15% of estimated total pay quantity; determining dredge capacities; available major dredging equipment in Great Lakes area; dredging schedule, in units of 1000 cu yd.
Scheduling equipment for Great Lakes channel dredging
Connecting channels authorized to be deepened total 168 mi; total amount to be moved is 18,500,000 cu yd by hydraulic dredge and 28, 500,000 cu yd by other dredges includes 1 ft to pay overdepth of 15% of estimated total pay quantity; determining dredge capacities; available major dredging equipment in Great Lakes area; dredging schedule, in units of 1000 cu yd.
Scheduling equipment for Great Lakes channel dredging
Civ Eng (NY)
Hyzer, P.C. (author) / Hill, H.E. (author)
Civil Engineering ; 27
1957
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
The Great Lakes Maritime Task Force -- Great Lakes Dredging Crisis
Online Contents | 2007
US House Approves Great Lakes Dredging
Online Contents | 2007
Great Lakes Wins Boston Harbor Dredging Project
Online Contents | 1998
Future Dredging Quantities in the Great Lakes
NTIS | 1974
|