A platform for research: civil engineering, architecture and urbanism
Rolled earth dam on Lewis River will rise 512 ft and contain more than 15 million cu yd of materials; concrete spillway structure will bypass earthfill portion, running 1400 ft along side of hill; power tunnel, 1535 ft long, will have 25 ft full steel pressure liner; two powerhouses will have installed capacity of 204,000 and 70,000 kw respectively.
Rolled earth dam on Lewis River will rise 512 ft and contain more than 15 million cu yd of materials; concrete spillway structure will bypass earthfill portion, running 1400 ft along side of hill; power tunnel, 1535 ft long, will have 25 ft full steel pressure liner; two powerhouses will have installed capacity of 204,000 and 70,000 kw respectively.
Swift dam
Pac Bldr Engr
Nelson, P. (author)
1957
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
ASCE | 2021
|ASCE | 2016
|Trust delighted with swift progress
British Library Online Contents | 2001
Swift rolling of roof sheeting
Tema Archive | 1984