A platform for research: civil engineering, architecture and urbanism
Fast finish for Beardsley Dam
Beardsley Dam is rolled earth, sand, gravel and cobble fill embankment with dumped rock on upstream and downstream slopes; it will store about 97,500 acre ft; embankment is 885 ft long at crest with max height of 265 ft; contractor averaged 16,000 cu yd per day to finish 3,120,000 cu yd.
Fast finish for Beardsley Dam
Beardsley Dam is rolled earth, sand, gravel and cobble fill embankment with dumped rock on upstream and downstream slopes; it will store about 97,500 acre ft; embankment is 885 ft long at crest with max height of 265 ft; contractor averaged 16,000 cu yd per day to finish 3,120,000 cu yd.
Fast finish for Beardsley Dam
Western Construction
Western Construction ; 32
1957
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
UB Braunschweig | 1983
|Engineering Index Backfile | 1956
Discussion of “Beardsley on Yellow River Problem”
ASCE | 2021
|Beardsley and the Autonomy of the Work of Art
British Library Online Contents | 2005
|Fast Feedback Boosts Finish Quality
British Library Online Contents | 1994