A platform for research: civil engineering, architecture and urbanism
Preliminary work, highline, concrete system, regulating dam, fish facilities and aggregate plant at Deschutes River project; main structure will be thin arch type with variable radius; note on powerhouse where three generating units will develop 120,000 kw rated capacity; turbines will be Francis type, developing 55,000 hp at 150-ft head, running at 138 1/2 rpm.
Preliminary work, highline, concrete system, regulating dam, fish facilities and aggregate plant at Deschutes River project; main structure will be thin arch type with variable radius; note on powerhouse where three generating units will develop 120,000 kw rated capacity; turbines will be Francis type, developing 55,000 hp at 150-ft head, running at 138 1/2 rpm.
Atkinson moves fast at Pelton Dam
Pac Bldr Engr
Nelson, P. (author)
1957
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
PELTON TURBINE TECHNOLGY - Modern technologies for producing Pelton runners
Online Contents | 2006
|PELTON TURBINES - Inspecting HVOF-coated Pelton runners using active thermography
Online Contents | 2013
|PELTON TURBINE TECHNOLOGY - Repairing cast Pelton runners: Problems and modern solutions
Online Contents | 1999
|PELTON TURBINE TECHNOLOGY - A new step in hooped Pelton runner development
Online Contents | 2003
|PELTON TURBINE TECHNOLOGY - Design and production of high performance Pelton turbines
Online Contents | 2002
|