A platform for research: civil engineering, architecture and urbanism
Five huge derricks build concrete dam in Italy
Pian Telessio concrete arch-gravity dam is part of Resone hydroelectric development; five fixed steel tower mounted derricks handled final delivery and placement of concrete; mast and boom of derricks are 70 m and 60 m respectively; derrick is operated by electric motors controlling three winches; main features of dam and construction equipment used.
Five huge derricks build concrete dam in Italy
Pian Telessio concrete arch-gravity dam is part of Resone hydroelectric development; five fixed steel tower mounted derricks handled final delivery and placement of concrete; mast and boom of derricks are 70 m and 60 m respectively; derrick is operated by electric motors controlling three winches; main features of dam and construction equipment used.
Five huge derricks build concrete dam in Italy
World Construction
Girola, C. (author)
World Construction ; 10
1957
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Fixed derricks on towers build high concrete bridge
Engineering Index Backfile | 1935
Two traveling tower Derricks erect huge timber blimp hangar
Engineering Index Backfile | 1943
Huge timber arches for navy blimp hangar erected by tower derricks
Engineering Index Backfile | 1943
Guy Derricks place concrete for Loyalhanna Dam
Engineering Index Backfile | 1943
Derricks do job on Memphis bridge
Engineering Index Backfile | 1949