A platform for research: civil engineering, architecture and urbanism
1,500,000 tons of crushed stone for single paving season
Plant erected near Eskridge, south of Topeka, Kan by Concrete Materials and Construction Co, embodying Cedarapids equipment throughout, supplied subbase, base and shoulder stone for three adjoining paving sections, totaling 25 mi; layout and components of plant, showing elaborate set of belt and screening equipment required to eliminate excess fines and dirt. (see also World Construction v 10 n 7 July 1957 p 50, 53-6)
1,500,000 tons of crushed stone for single paving season
Plant erected near Eskridge, south of Topeka, Kan by Concrete Materials and Construction Co, embodying Cedarapids equipment throughout, supplied subbase, base and shoulder stone for three adjoining paving sections, totaling 25 mi; layout and components of plant, showing elaborate set of belt and screening equipment required to eliminate excess fines and dirt. (see also World Construction v 10 n 7 July 1957 p 50, 53-6)
1,500,000 tons of crushed stone for single paving season
Roads Streets
Roads and Streets ; 100
1957
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
1,500,000 tons of crushed stone for single paving season
Engineering Index Backfile | 1957
Producing 1,500,000 tons for Kansas turnpike
Engineering Index Backfile | 1956
|$1,500,000 gravity water supply project
Engineering Index Backfile | 1925
Engineering Index Backfile | 1953
|