A platform for research: civil engineering, architecture and urbanism
Construction in reinforced concrete at Dutch colliery
At Julia coal mine at Eygelshoven, more important localities on 1800-ft level, serving as loading stations, pump rooms, locomotive garage, etc, have been lined with reinforced concrete; constructional aspects of these excavations; details of various cross sections.
Construction in reinforced concrete at Dutch colliery
At Julia coal mine at Eygelshoven, more important localities on 1800-ft level, serving as loading stations, pump rooms, locomotive garage, etc, have been lined with reinforced concrete; constructional aspects of these excavations; details of various cross sections.
Construction in reinforced concrete at Dutch colliery
Great Britain Nat Coal Board -- Information Bul
Groothoff, C.W.J. (author)
1956
15 pages
Report
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Reinforced concrete for colliery surface plant
Engineering Index Backfile | 1936
|New dutch instructions relative to reinforced concrete construction
Engineering Index Backfile | 1919
Construction of a cement concrete dam at Mid-Cannock colliery
Engineering Index Backfile | 1925
|Reinforced concrete pit-head frame at the National Maurits colliery, Holland
Engineering Index Backfile | 1926
Planning and construction of parkside colliery
Engineering Index Backfile | 1962
|