A platform for research: civil engineering, architecture and urbanism
How rock island renews bridge floors in panels
Method developed for renewing bridge ties on steel spans; ties are assembled in 14-ft panels and set in place by crane; to prevent ties from becoming detached during lifting, untreated 4 in. by 4 in. by 14 ft timber is placed on each side beneath tie ends and strapped in place by steel bands.
How rock island renews bridge floors in panels
Method developed for renewing bridge ties on steel spans; ties are assembled in 14-ft panels and set in place by crane; to prevent ties from becoming detached during lifting, untreated 4 in. by 4 in. by 14 ft timber is placed on each side beneath tie ends and strapped in place by steel bands.
How rock island renews bridge floors in panels
Ry Track Structures
1957
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile
Online Contents | 2002
Engineering Index Backfile | 1939
|Engineering Index Backfile | 1915
British Library Online Contents | 2006