A platform for research: civil engineering, architecture and urbanism
Dollies Haul big concrete bridge girders
Construction and materials handling at Second Narrows Bridge in Vancouver; tractor pulled dollies lift and transport massive stringers, each of which weighs 72 tons, from casting yard to erection site; stringers 12 abreast will connect 10 of bridge's 17 concrete piers and will support 6-lane 80-ft-wide concrete deck on both approaches.
Dollies Haul big concrete bridge girders
Construction and materials handling at Second Narrows Bridge in Vancouver; tractor pulled dollies lift and transport massive stringers, each of which weighs 72 tons, from casting yard to erection site; stringers 12 abreast will connect 10 of bridge's 17 concrete piers and will support 6-lane 80-ft-wide concrete deck on both approaches.
Dollies Haul big concrete bridge girders
Construction Methods Equipment
1957
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
FRP-Wood-Concrete Composite Bridge Girders
ASCE | 2000
|Optimisation of Reinforced Concrete Bridge Girders
British Library Conference Proceedings | 1998
|Bridge Girders With Prestressed Concrete Tension Ties
British Library Conference Proceedings | 2002
|Serviceability Criteria for Prestressed Concrete Bridge Girders
British Library Conference Proceedings | 1995
|