A platform for research: civil engineering, architecture and urbanism
Reflooring long Winnipeg bridge to save continual maintenance
Operations involved in project included removal of existing wood planking, installation of steel sills and steel corrugated planks, and asphalt paving; structural steel channel sills were placed at right angles to traffic movement and were welded to existing structural steel bridge stringers.
Reflooring long Winnipeg bridge to save continual maintenance
Operations involved in project included removal of existing wood planking, installation of steel sills and steel corrugated planks, and asphalt paving; structural steel channel sills were placed at right angles to traffic movement and were welded to existing structural steel bridge stringers.
Reflooring long Winnipeg bridge to save continual maintenance
Roads Eng Construction
Striowski, J.B. (author)
1957
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Maintenance and operating problems of Winnipeg
Engineering Index Backfile | 1949
|Winnipeg. The Winnipeg town planning situation
Engineering Index Backfile | 1928
|Maintenance and Operating Problems of Winnipeg
Wiley | 1949
|Winnipeg structure embodies latest ideas in bridge lighting
Engineering Index Backfile | 1933
|Provencher Bridge Over the Red River, Winnipeg, Manitoba
British Library Conference Proceedings | 1990
|