A platform for research: civil engineering, architecture and urbanism
Precast concrete speeds completion
Drive-in bank in New South Wales at Burwood, involves uninhibited use of precast concrete both for structural frame, walls and for roof; building was completed in 12 weeks; higher portions proceeded simultaneously with work on rear portion where precast elements were used.
Precast concrete speeds completion
Drive-in bank in New South Wales at Burwood, involves uninhibited use of precast concrete both for structural frame, walls and for roof; building was completed in 12 weeks; higher portions proceeded simultaneously with work on rear portion where precast elements were used.
Precast concrete speeds completion
Constructional Rev
1957
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Precast concrete speeds apartment construction
Engineering Index Backfile | 1965
Electric heat speeds curing of precast concrete joists
Engineering Index Backfile | 1939
|Precast walls speed dormitory completion
Engineering Index Backfile | 1949
|PRECAST - Precast Concrete Frames
Online Contents | 1998
|PRECAST CONCRETE - Precast concrete floors: The future
Online Contents | 2001
|