A platform for research: civil engineering, architecture and urbanism
Shuttering for concrete wind tunnel
In construction of wind tunnel for high velocity testing at aircraft laboratory, shuttering for concrete surface was designed that would not deviate more than 1/64 in. from specified curvature, and thus dispense with plastering to produce true profile.
Shuttering for concrete wind tunnel
In construction of wind tunnel for high velocity testing at aircraft laboratory, shuttering for concrete surface was designed that would not deviate more than 1/64 in. from specified curvature, and thus dispense with plastering to produce true profile.
Shuttering for concrete wind tunnel
Concrete Constr Eng
1945
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Progressive concrete shuttering
Engineering Index Backfile | 1945
|CONTRACTS - Shuttering problems hit A27 tunnel.
Online Contents | 1995