A platform for research: civil engineering, architecture and urbanism
How 10.5-ton water pipe sections were laid across peat bog
Article explains how 12,240 ft of 54 in. water mains were laid from Green River Watershed for City of Tacoma; pressure pipe is of reinforced concrete lock joint type.
How 10.5-ton water pipe sections were laid across peat bog
Article explains how 12,240 ft of 54 in. water mains were laid from Green River Watershed for City of Tacoma; pressure pipe is of reinforced concrete lock joint type.
How 10.5-ton water pipe sections were laid across peat bog
Pac Bldr Engr
1945
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Pipe laid across Panama canal by use of cable support
Engineering Index Backfile | 1932
|Metal-base pavement sections laid as experiments
Engineering Index Backfile | 1930
Metal-base pavement sections laid as experiments
Engineering Index Backfile | 1930