A platform for research: civil engineering, architecture and urbanism
Rapid transit subways for Montreal
Due to severe congestion in central area, Montreal studies plans for two rapid transit subways, cost estimated at $60,815,000 and construction to take 4 yr; details of design of structures given.
Rapid transit subways for Montreal
Due to severe congestion in central area, Montreal studies plans for two rapid transit subways, cost estimated at $60,815,000 and construction to take 4 yr; details of design of structures given.
Rapid transit subways for Montreal
Roads Bridges
Roads and Bridges ; 83
1945
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Rapid-transit subways in Moscow
Engineering Index Backfile | 1945
|Rapid transit subways for Chicago
Engineering Index Backfile | 1939
|Rapid transit subways in metropolitan cities
Engineering Index Backfile | 1900
Present status of Toronto rapid transit subways
Engineering Index Backfile | 1946
Engineering Index Backfile | 1928