A platform for research: civil engineering, architecture and urbanism
750,000-ton rock fill for 1.2 miles of road in Sudbury district
Heavily traveled highways relocated to avoid sharp curves and steep grades; mine rock waste was used from operations of International Nickel Co who built road in conformity with engineering plans furnished by Ontario Dept of Highways.
750,000-ton rock fill for 1.2 miles of road in Sudbury district
Heavily traveled highways relocated to avoid sharp curves and steep grades; mine rock waste was used from operations of International Nickel Co who built road in conformity with engineering plans furnished by Ontario Dept of Highways.
750,000-ton rock fill for 1.2 miles of road in Sudbury district
Roads Bridges
Roads and Bridges ; 83
1945
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Slag losses in the Sudbury district
Engineering Index Backfile | 1930
|Pipeline two miles long delivers sand fill to airfield
Engineering Index Backfile | 1958
Engineering Index Backfile | 1931
A coast city protects its harbor by constructing a new breakwater costing $750,000
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1949
|