A platform for research: civil engineering, architecture and urbanism
Triple push loading speeded Minnesota grading job
Highlights of construction of 7.88-mi section of Minnesota Trunk Highway 100 including 2 drain sections, 2 small bridges, railroad underpass and 730-ft, 7-span bridge.
Triple push loading speeded Minnesota grading job
Highlights of construction of 7.88-mi section of Minnesota Trunk Highway 100 including 2 drain sections, 2 small bridges, railroad underpass and 730-ft, 7-span bridge.
Triple push loading speeded Minnesota grading job
Roads Streets
Roads and Streets ; 88
1945
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
21 twin-engine units speeded 4,000,000-yard grading job
Engineering Index Backfile | 1957
|21 twin-engine units speeded 4,000,000-yard grading job
Engineering Index Backfile | 1957
|Rock cuts, tunnelling speeded by bolting
Engineering Index Backfile | 1956
Scrap handling speeded with automatic shear-baler
Engineering Index Backfile | 1954
|War contract settlements speeded by contractors' action
Engineering Index Backfile | 1944
|