A platform for research: civil engineering, architecture and urbanism
About 22-mi of alleys were paved during 1944 by municipal crews, using air entraining cement and modern equipment methods; 2 crews were organized, one using ready mixed concrete and other used 27-E paver; concrete spreading and finishing methods described; pavement specifications given.
About 22-mi of alleys were paved during 1944 by municipal crews, using air entraining cement and modern equipment methods; 2 crews were organized, one using ready mixed concrete and other used 27-E paver; concrete spreading and finishing methods described; pavement specifications given.
Minneapolis paves 195 blocks of alleys
Roads Streets
Paul, F.T. (author)
Roads and Streets ; 87
1944
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Conference Proceedings | 2002
|British Library Online Contents | 2004
|Engineering Index Backfile | 1942
|