A platform for research: civil engineering, architecture and urbanism
Three years of dredging will be required to undo work of nature over 33-yr period in depositing sand in Roslyn Lake, forebay and storage reservoir for station "O" hydroelectric plant, at Bull Run, near Portland, Ore; dredging equipment illustrated and described; procedure for removing accumulation of sand.
Three years of dredging will be required to undo work of nature over 33-yr period in depositing sand in Roslyn Lake, forebay and storage reservoir for station "O" hydroelectric plant, at Bull Run, near Portland, Ore; dredging equipment illustrated and described; procedure for removing accumulation of sand.
Dredging to regain hydro storage
Elec Light Power
Porter, A.J. (author)
1945
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Prediction of hydro-suction dredging depth using data-driven methods
Springer Verlag | 2021
|Thixotropic strength regain of clays
Engineering Index Backfile | 1949
|Problems with the Static Regain method
British Library Online Contents | 1999
|Pumped storage power station pipeline dredging device and dredging method
European Patent Office | 2023
|DREDGING - Dredging contractors
Online Contents | 2000