A platform for research: civil engineering, architecture and urbanism
Article explains how concrete piles were jetted, 1450 ft by 87 ft deck poured, rails anchored and labor shortages met in construction of Marginal Wharf for Navy Dept on Hood Canal, near Bangor, Wash.
Article explains how concrete piles were jetted, 1450 ft by 87 ft deck poured, rails anchored and labor shortages met in construction of Marginal Wharf for Navy Dept on Hood Canal, near Bangor, Wash.
Concreting big Marginal Wharf at Bangor
Pac Bldr Engr
Edwards, H.H. (author)
1945
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Design Issues for Marginal Wharf Structures
ASCE | 2004
|Seismic Response of Linked Marginal Wharf Segments
Online Contents | 2003
|