A platform for research: civil engineering, architecture and urbanism
Drives shotcrete-encased piles
Because of severe marine borer infestation in pile foundations of two of its waterfront piers, Southern has recently redriven number of piles, pre-jacketed with concrete, in foundations; piles were preframed and given creosote treatment, following which they were jacketed with reinforced shotcrete, before being driven, to protect them against both teredo and limnoria; method employed is described. (See also Ry Age v 119 n 22 Dec 1 1945 p 888-9)
Drives shotcrete-encased piles
Because of severe marine borer infestation in pile foundations of two of its waterfront piers, Southern has recently redriven number of piles, pre-jacketed with concrete, in foundations; piles were preframed and given creosote treatment, following which they were jacketed with reinforced shotcrete, before being driven, to protect them against both teredo and limnoria; method employed is described. (See also Ry Age v 119 n 22 Dec 1 1945 p 888-9)
Drives shotcrete-encased piles
Ry Eng Maintenance
1945
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Drives shotcrete-encased piles
Engineering Index Backfile | 1945
Static Analysis of Retention Elements Using Piles and Shotcrete
TIBKAT | 2019
|Performance of precast hollow steel-encased high-strength concrete piles
Elsevier | 2019
|Special Processes: Combinations of TBM Drives with Shotcrete
Wiley | 2008
|