A platform for research: civil engineering, architecture and urbanism
Sand fill 60' high in deep tidewater
Notes on construction of 1019 by 396-ft pier into Elliott Bay, Port of Seattle, Wash; in order to build pier, earth fill center section was placed inside solid steel bulkhead formed by Z 32 steel sheet piles up to 60 ft long.
Sand fill 60' high in deep tidewater
Notes on construction of 1019 by 396-ft pier into Elliott Bay, Port of Seattle, Wash; in order to build pier, earth fill center section was placed inside solid steel bulkhead formed by Z 32 steel sheet piles up to 60 ft long.
Sand fill 60' high in deep tidewater
Pac Bldr Engr
Treadwell, G.T. (author)
1945
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Refrigeration terminal on tidewater
Engineering Index Backfile | 1935
|An analysis of the tidewater Pooling plan
Engineering Index Backfile | 1917
Cooling water for steam electric stations on tidewater
Engineering Index Backfile | 1960
|Tidewater Metropolitan Area Transportation Survey Study
NTIS | 1975
|Cooling Water for Steam Electric Stations on Tidewater
ASCE | 2021
|