A platform for research: civil engineering, architecture and urbanism
Jetty built to resist heavy seas
Outer portions of Columbia River jetty have been rebuilt with concrete terminal and toe walls planned for maximum resistance to high, storm driven waves; design and methods of construction are based on long experience with damage from extremely severe wave action.
Jetty built to resist heavy seas
Outer portions of Columbia River jetty have been rebuilt with concrete terminal and toe walls planned for maximum resistance to high, storm driven waves; design and methods of construction are based on long experience with damage from extremely severe wave action.
Jetty built to resist heavy seas
Eng News-Rec
Engineering News-Record ; 135
1945
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Broad Toe Berm Jetty Head Design, Yaquina North Jetty
ASCE | 2004
|Engineering Index Backfile | 1956
|British Library Online Contents | 1993
|TIBKAT | 1948
|Engineering Index Backfile | 1948
|