A platform for research: civil engineering, architecture and urbanism
Guam superhighway built in sixty days
Construction of 4-lane superhighway by Seabees described.
Guam superhighway built in sixty days
Construction of 4-lane superhighway by Seabees described.
Guam superhighway built in sixty days
Civ Eng (NY)
Hiltabidle, Jr., W.O. (author)
1945
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Modern rigid-frame bridge built by seabees on Guam
Engineering Index Backfile | 1945
|Engineering Index Backfile | 1928
|Engineering Index Backfile | 1953
Engineering Index Backfile | 1957
|Superhighway lighting installation
Engineering Index Backfile | 1953
|