A platform for research: civil engineering, architecture and urbanism
Wintertime concreting at soo
Modern methods of cold weather concreting employed in construction of 878-ft long concrete facing wall along approach canal to MacArthur Lock at Sault Ste. Marie, Mich, paid big dividends in time saved and results accomplished; by completely enclosing wall in weatherproof housing supported by tubular steel scaffolding, contractor was able to complete job in dead of winter despite sub-zero temperatures and heavy snowfalls.
Wintertime concreting at soo
Modern methods of cold weather concreting employed in construction of 878-ft long concrete facing wall along approach canal to MacArthur Lock at Sault Ste. Marie, Mich, paid big dividends in time saved and results accomplished; by completely enclosing wall in weatherproof housing supported by tubular steel scaffolding, contractor was able to complete job in dead of winter despite sub-zero temperatures and heavy snowfalls.
Wintertime concreting at soo
Eng News-Rec
Engineering News-Record ; 135
1945
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1937
|