A platform for research: civil engineering, architecture and urbanism
110-ton bridge slabs precast on shore
Construction work on Route 33 bridge over Mattaponi River; West Point, Va; 31 precast trestle panels were floated to position and set by means of barges, using special gantry crane for loading; over 14,000 lin ft of long piling also built at well designed concreting yard. (see also Eng News Rec v 135 n 16 Oct 18 1945 p 490-3)
110-ton bridge slabs precast on shore
Construction work on Route 33 bridge over Mattaponi River; West Point, Va; 31 precast trestle panels were floated to position and set by means of barges, using special gantry crane for loading; over 14,000 lin ft of long piling also built at well designed concreting yard. (see also Eng News Rec v 135 n 16 Oct 18 1945 p 490-3)
110-ton bridge slabs precast on shore
Roads Streets
Roads and Streets ; 88
1945
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
110-ton bridge slabs precast on shore
Engineering Index Backfile | 1945
Precast concrete bridge deck slabs
Engineering Index Backfile | 1950
Precast slabs make low-cost bridge
Engineering Index Backfile | 1951
|Precast concrete slabs face bridge abutments
Engineering Index Backfile | 1940
|Transfer of load between precast bridge slabs
Engineering Index Backfile | 1961
|