A platform for research: civil engineering, architecture and urbanism
Heavy storms at Guam moved aside concrete barges sunk as temporary harbor protection and dictated use of armor rock facing ranging up to 30 tons in weight; fill, composed of quarry rock rated as " coral limestone" required 1.5 to 2 lb of powder per cu yd for blasting.
Heavy storms at Guam moved aside concrete barges sunk as temporary harbor protection and dictated use of armor rock facing ranging up to 30 tons in weight; fill, composed of quarry rock rated as " coral limestone" required 1.5 to 2 lb of powder per cu yd for blasting.
Building port apra breakwater
Eng News-Rec
Day, R.P. (author)
Engineering News-Record ; 135
1945
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Navy completes one of world's longest single breakwater structures at Apra, Guam
Engineering Index Backfile | 1947
|Port Arthur harbor breakwater construction
Engineering Index Backfile | 1931
Breakwater, at Port Crescent, Washington
Engineering Index Backfile | 1893
|Port of Brownsville Floating Breakwater
ASCE | 2001
|