A platform for research: civil engineering, architecture and urbanism
Unlined tunnels of snowy mountain hydro-electric authority, Australia
Design and construction of completed unlined tunnel is used to illustrate practice adopted by Hydro-Electric Authority; summary is given of all unlined tunnels in Snowy Mountains Scheme and also behavior of 4 tunnels after several years service; hydraulic data together with rock measurements are described; operational experience is examined in assessing modification to design criteria and construction methods.
Unlined tunnels of snowy mountain hydro-electric authority, Australia
Design and construction of completed unlined tunnel is used to illustrate practice adopted by Hydro-Electric Authority; summary is given of all unlined tunnels in Snowy Mountains Scheme and also behavior of 4 tunnels after several years service; hydraulic data together with rock measurements are described; operational experience is examined in assessing modification to design criteria and construction methods.
Unlined tunnels of snowy mountain hydro-electric authority, Australia
ASCE -- Proc (J Power Div)
Dann, H.E. (author) / Hartwig, W.P. (author) / Hunter, J.R. (author)
1964
33 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Contractor's view on unlined tunnels
Engineering Index Backfile | 1964
|Hydraulic design of unlined rock tunnels
Engineering Index Backfile | 1969
|Hydraulic Design of Unlined Rock Tunnels
ASCE | 2021
|Head losses in unlined rock tunnels
UB Braunschweig | 1970
|Rock trap experience in unlined tunnels
Engineering Index Backfile | 1964
|