21-mile, 60-inch water line built for attractive price
Construction of raw water transmission line from Cheney Reservoir pumping station to Wichita, Kan completed in Nov 1964, is described; feature of project was completion of more than 111,000 ft of 60-in. diam prestressed concrete water main for less than 4,400,000 dollars; in process of pipe installation, excavation was made by ladder type trenching machine with adjustable side-cutters; machine cut round-bottomed trench with sloping sides, approximately 12 ft wide at top and 8.5 ft at bottom; highloader, working in ditch was equipped with special bucket having rounded section to match pipe contour.
21-mile, 60-inch water line built for attractive price
Construction of raw water transmission line from Cheney Reservoir pumping station to Wichita, Kan completed in Nov 1964, is described; feature of project was completion of more than 111,000 ft of 60-in. diam prestressed concrete water main for less than 4,400,000 dollars; in process of pipe installation, excavation was made by ladder type trenching machine with adjustable side-cutters; machine cut round-bottomed trench with sloping sides, approximately 12 ft wide at top and 8.5 ft at bottom; highloader, working in ditch was equipped with special bucket having rounded section to match pipe contour.
21-mile, 60-inch water line built for attractive price
Pub Works
Weller, L.W. (author)
Public Works ; 96
1965
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Five-mile seawall built on precast piles
Engineering Index Backfile | 1932
|Port Townsend's 30-mile water supply line
Engineering Index Backfile | 1928
|ASCE | 2020
|The Ordnance Survey one inch-mile black outline, coloured roads district map 1899-193?
Online Contents | 1994
|5-mile James river bridge built in 13 months
Engineering Index Backfile | 1929