A platform for research: civil engineering, architecture and urbanism
Tunneling through decomposed quartz-dioxite for Tenche Tunnel and diversion tunnel for Miraflores Dam, parts of Medellin hydro development in Colombian Andes is described; sealing by lapped Armco steel sheeting plank and by tight breast-boarding was effective in preventing start of flows.
Tunneling through decomposed quartz-dioxite for Tenche Tunnel and diversion tunnel for Miraflores Dam, parts of Medellin hydro development in Colombian Andes is described; sealing by lapped Armco steel sheeting plank and by tight breast-boarding was effective in preventing start of flows.
Flow slides prove hazardous in Colombia tunnels
Civ Eng (NY)
Li, C.Y. (author)
1964
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Curing slides with drainage tunnels
Engineering Index Backfile | 1947
Southern Pacific controls slides with drainage tunnels
Engineering Index Backfile | 1945
Sewer tunnels in Singapore prove tough testing ground
British Library Online Contents | 2004
|British Library Conference Proceedings | 2005
|Flow slides in Mississippi riverbanks
British Library Conference Proceedings | 1993
|