A platform for research: civil engineering, architecture and urbanism
Pipe laying record at Little Rock
Construction of asbestos cement water main at Little Rock, Ark, where 9400 ft of 6 in. pipe was placed in trenches, coupled, backfilled and made ready to carry water in 9 days.
Pipe laying record at Little Rock
Construction of asbestos cement water main at Little Rock, Ark, where 9400 ft of 6 in. pipe was placed in trenches, coupled, backfilled and made ready to carry water in 9 days.
Pipe laying record at Little Rock
Eng News-Rec
Engineering News-Record ; 123
1939
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.