A platform for research: civil engineering, architecture and urbanism
Chicago's first filtration plant to serve half of city's area
Plant being constructed as major portion of project estimated to cost $20,000,000; in addition to plant, project includes breakwater built as rubble mound structure 2260 ft long; bulkhead enclosing filtration plant, new beach and park fill of 115 acres, filtration plant tunnels, and substructure of plant; features of project described; 230,000 cu yd of concrete being distributed by pipe line system.
Chicago's first filtration plant to serve half of city's area
Plant being constructed as major portion of project estimated to cost $20,000,000; in addition to plant, project includes breakwater built as rubble mound structure 2260 ft long; bulkhead enclosing filtration plant, new beach and park fill of 115 acres, filtration plant tunnels, and substructure of plant; features of project described; 230,000 cu yd of concrete being distributed by pipe line system.
Chicago's first filtration plant to serve half of city's area
Concrete
Concrete ; 48
1940
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New York City's First Water Filtration Plant
British Library Conference Proceedings | 1994
|Activated Carbon at Bay City's Filtration Plant
Wiley | 1931
|Chicago's south district water filtration project
Engineering Index Backfile | 1939
|