A platform for research: civil engineering, architecture and urbanism
Equipment and methods used in repairing North Hill Viaduct, in Akron, Ohio, 2840 ft long, involving cutting out of all bad concrete, cleaning or replacing steel, and building back section with pressure concrete; traveling and swinging scaffolds used in repairing underside of bridge; new expansion joints provided with drains to eliminate concrete damage from leakage. (See also Eng News-Rec v 125 n 7 Aug 15 1940 p 226-8)
Equipment and methods used in repairing North Hill Viaduct, in Akron, Ohio, 2840 ft long, involving cutting out of all bad concrete, cleaning or replacing steel, and building back section with pressure concrete; traveling and swinging scaffolds used in repairing underside of bridge; new expansion joints provided with drains to eliminate concrete damage from leakage. (See also Eng News-Rec v 125 n 7 Aug 15 1940 p 226-8)
Repairing concrete arch viaduct
Pub Works
Van Brimmer, R. (author)
Public Works ; 71
1940
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Repairing concrete arch viaduct
Engineering Index Backfile | 1940
|Engineering Index Backfile | 1940
|The Santa Ana concrete arch viaduct
Engineering Index Backfile | 1903
Victoria concrete arch and viaduct Guelph, Ont
Engineering Index Backfile | 1921
|