A platform for research: civil engineering, architecture and urbanism
Tin dredging in Malaya
Description of 7 new dredges and 4 reconditioned dredges, put into commission on properties under general managership of Anglo-Oriental (Malaya) Limited; total cost exceeds £1,500,000; new dredges include five with bucket capacity of 18 cu ft, four of which are built to dig to 130 ft from paddock water level.
Tin dredging in Malaya
Description of 7 new dredges and 4 reconditioned dredges, put into commission on properties under general managership of Anglo-Oriental (Malaya) Limited; total cost exceeds £1,500,000; new dredges include five with bucket capacity of 18 cu ft, four of which are built to dig to 130 ft from paddock water level.
Tin dredging in Malaya
Mine Quarry Eng
1940
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1930
|Engineering Index Backfile | 1930
|Engineering Index Backfile | 1955
Suction-cutter dredging for tin in Malaya
Engineering Index Backfile | 1929
|Development of tin dredging in Federated Malaya States
Engineering Index Backfile | 1933
|