A platform for research: civil engineering, architecture and urbanism
Variable construction methods on twelve mile project
Construction methods and equipment used in relocation of about 12 mi of Pacific Highway, US 99, north of Vancouver, Wash; hydraulic grading, "high line" cable way, foundation settlement; cost data.
Variable construction methods on twelve mile project
Construction methods and equipment used in relocation of about 12 mi of Pacific Highway, US 99, north of Vancouver, Wash; hydraulic grading, "high line" cable way, foundation settlement; cost data.
Variable construction methods on twelve mile project
Roads Streets
Brown, V.J. (author)
Roads and Streets ; 83
1940
9 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Twelve mile paving project involving Viaduct and bridge
Engineering Index Backfile | 1928
Twelve mile paving project involving viaduct and bridge
Engineering Index Backfile | 1928
A new twelve-mile Italian tunnel
Engineering Index Backfile | 1909
A twelve-mile concrete pipe conduit
Engineering Index Backfile | 1909
Twelve contractors drive 85-mile rock tunnel for Delaware aqueduct
Engineering Index Backfile | 1940