A platform for research: civil engineering, architecture and urbanism
Illustrated description of work in progress for covering 411 yd of river and constructing of reinforced concrete road; roadway between Mersey bridge and Lancashire bridge is to be carried on 54 portal frames, with expansion joint between each group of six portals; surface works will comprise 45-ft roadway with eight central islands and two 15-ft footpaths. See also Engineering Index 1938 p 1047. (French translation) (See also Engineer v 169 n 4393 Mar 22 1940 p 284-5)
Illustrated description of work in progress for covering 411 yd of river and constructing of reinforced concrete road; roadway between Mersey bridge and Lancashire bridge is to be carried on 54 portal frames, with expansion joint between each group of six portals; surface works will comprise 45-ft roadway with eight central islands and two 15-ft footpaths. See also Engineering Index 1938 p 1047. (French translation) (See also Engineer v 169 n 4393 Mar 22 1940 p 284-5)
Road over River Mersey at Stockport
Genie Civil
Rhodes, E. (author)
Genie Civil ; 116
1940
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Road over River Mersey at Stockport
Engineering Index Backfile | 1940
|Reinforced concrete road viaduct above and along course of river Mersey, Stockport
Engineering Index Backfile | 1938
|Engineering Index Backfile | 1935
Engineering Index Backfile | 1928
Proposed bridge over the Mersey River at Liverpool
Engineering Index Backfile | 1893
|