A platform for research: civil engineering, architecture and urbanism
Problems of slide control handled at grand coulee
Review of methods used by U S Bureau of Reclamation in controlling earth slides in connection with construction of dam, including system of drainage wells through slide connected by series of tunnels in bedrock, frozen earth dam, and drainage shaft heading number of drifts through water-bearing clay; excavation details; water flow in drifts; equipment used.
Problems of slide control handled at grand coulee
Review of methods used by U S Bureau of Reclamation in controlling earth slides in connection with construction of dam, including system of drainage wells through slide connected by series of tunnels in bedrock, frozen earth dam, and drainage shaft heading number of drifts through water-bearing clay; excavation details; water flow in drifts; equipment used.
Problems of slide control handled at grand coulee
Western Construction News
1940
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1942
Engineering Index Backfile | 1938
Engineering Index Backfile | 1938
Engineering Index Backfile | 1937
Freezing arch across toe of east forebay slide, Grand Coulee Dam
Engineering Index Backfile | 1937
|