A platform for research: civil engineering, architecture and urbanism
Jig versus riffle concentration in gold dredging
Attention directed to comparative ratios of concentration at various stages; hypothetical case of dredge treating 45,000 cu yd per week is discussed, volumes and ratios in diagram showing approximately what is to be expected in average property in one week's operation; advantages lie with jigs, as they reduce material by stages, in manner that permits adjustment without remodeling dredge.
Jig versus riffle concentration in gold dredging
Attention directed to comparative ratios of concentration at various stages; hypothetical case of dredge treating 45,000 cu yd per week is discussed, volumes and ratios in diagram showing approximately what is to be expected in average property in one week's operation; advantages lie with jigs, as they reduce material by stages, in manner that permits adjustment without remodeling dredge.
Jig versus riffle concentration in gold dredging
Eng Min J
Galloway, T.D. (author)
1940
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 1999
Engineering Index Backfile | 1899
|Engineering Index Backfile | 1901
|Online Contents | 1999