A platform for research: civil engineering, architecture and urbanism
Foundation unwatering methods used at Prado dam
Preparation of foundation, including unwatering, for earth fill dam in Southern California, having crest length of 2280 ft, max height of 105 ft; description of pumping installation for removal of water for foundation site.
Foundation unwatering methods used at Prado dam
Preparation of foundation, including unwatering, for earth fill dam in Southern California, having crest length of 2280 ft, max height of 105 ft; description of pumping installation for removal of water for foundation site.
Foundation unwatering methods used at Prado dam
Eng News-Rec
Engineering News-Record ; 125
1940
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Unwatering Akosombo Cofferdams
Engineering Index Backfile | 1964
|Dewatering and drainage structure of deep foundation pit unwatering well and construction method
European Patent Office | 2024
|Unwatering method applied to high-rise building deep foundation pit muddy earthwork excavation
European Patent Office | 2015
|