A platform for research: civil engineering, architecture and urbanism
Large peg model reproduces damsite borings
Construction of peg model of unusual dimensions, indicating conditions encountered in boring exploration for Kentucky Dam, under construction by Tennessee Valley Authority near Paducah, Ky; every foundation exploration hole is represented by steel rod painted to show materials and cavities encountered.
Large peg model reproduces damsite borings
Construction of peg model of unusual dimensions, indicating conditions encountered in boring exploration for Kentucky Dam, under construction by Tennessee Valley Authority near Paducah, Ky; every foundation exploration hole is represented by steel rod painted to show materials and cavities encountered.
Large peg model reproduces damsite borings
Eng News-Rec
Lynn, A.V. (author) / Rhoades, R.F. (author)
Engineering News-Record ; 124
1940
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Damsite surveying by seismograph
Engineering Index Backfile | 1940
|Suspension footbridges at Warragamba damsite
Engineering Index Backfile | 1952
|Foundation movements at San Gabriel damsite
Engineering Index Backfile | 1929
Geology of the St. Francis damsite
Engineering Index Backfile | 1928
|Engineering Index Backfile | 1950
|