A platform for research: civil engineering, architecture and urbanism
How cement pumping helped set concreting record
Description of cement handling facilities at Grand Coulee Dam, including eleven 5200-bbl storage silos, two blending silos, compressor equipment providing 13,000 cfm and pumps for unloading, blending and transporting cement, for more than one mile, to concrete mixing plant at dam site.
How cement pumping helped set concreting record
Description of cement handling facilities at Grand Coulee Dam, including eleven 5200-bbl storage silos, two blending silos, compressor equipment providing 13,000 cfm and pumps for unloading, blending and transporting cement, for more than one mile, to concrete mixing plant at dam site.
How cement pumping helped set concreting record
Western Construction News
1940
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1941
|Use of warm cement in concreting jobs
Engineering Index Backfile | 1955
|