A platform for research: civil engineering, architecture and urbanism
Discussion of causes of failure of timber centering used in construction of main arch span, 264 m long, of new Sando bridge at Stockholm, Sweden, having total length of 843 m; lessons to be learned from this failure. (See also Schweizerische Bauzeitung v 115 n 3 Jan 20 1940 p 27-30)
Discussion of causes of failure of timber centering used in construction of main arch span, 264 m long, of new Sando bridge at Stockholm, Sweden, having total length of 843 m; lessons to be learned from this failure. (See also Schweizerische Bauzeitung v 115 n 3 Jan 20 1940 p 27-30)
Zum Lehrgeruest-Einsturz der Sandoe-Bruecke ueber den Angermanaelv in Schweden
Zum Lehrgeruest-Einsturz der Sandoe-Bruecke ueber den Angermanaelv in Schweden
Ros, M. (author)
Genie Civil ; 116
1940
Article (Journal)
French
© Metadata Copyright Elsevier B. V. All rights reserved.
Zum Lehrgeruest-Einsturz der Sandoe-Bruecke ueber den Angermanaelv in Schweden
Engineering Index Backfile | 1940
|Einsturz der Koror-Babelthuap Bruecke in Palau
British Library Online Contents | 1997
|British Library Online Contents | 1999
|British Library Online Contents | 1998
|Engineering Index Backfile | 1940
|