A platform for research: civil engineering, architecture and urbanism
Construction of new concrete slab floor for old 3-span combined steel truss bridge, about 600 ft long; details of expansion joints; instructions for application of silicate of soda to roads and floors; cost data. (See also - discussion p 84a-f)
Construction of new concrete slab floor for old 3-span combined steel truss bridge, about 600 ft long; details of expansion joints; instructions for application of silicate of soda to roads and floors; cost data. (See also - discussion p 84a-f)
Reflooring sukkur channel bridge
Punjab Eng Congress -- Proc
Kumar, S.L. (author)
Punjab Engineering Congress -- Meeting ; 1939
1939
10 pages
Supp Plates
Conference paper
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1890
Erection of the cantilever bridge in Sukkur, India
Engineering Index Backfile | 1891
|Engineering Index Backfile | 1928
Engineering Index Backfile | 1922
Sukkur irrigation project: sind
Engineering Index Backfile | 1932