A platform for research: civil engineering, architecture and urbanism
Redecking old bridge with treated timber
Method of placing durable treated timber deck on 35-yr old Morrison Street bridge in Portland, Ore; details of deck construction on trestle approach and on steel channel spans; asphalt pavement.
Redecking old bridge with treated timber
Method of placing durable treated timber deck on 35-yr old Morrison Street bridge in Portland, Ore; details of deck construction on trestle approach and on steel channel spans; asphalt pavement.
Redecking old bridge with treated timber
Eng News-Rec
Engineering News-Record ; 124
1940
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Treated timber in dock and bridge construction
Engineering Index Backfile | 1930
|Treated timber in dock and bridge construction
Engineering Index Backfile | 1930
|Considerations when Paving Treated Timber Bridge Decks
British Library Conference Proceedings | 2001
|NTIS | 2001
British Library Online Contents | 2004