A platform for research: civil engineering, architecture and urbanism
15 story shaft houses conditioning rooms in modernized office building
In 17-story Merchants National Bank Building in Mobile, Ala, it was not practicable to take up valuable space for equipment; masonry shaft was built alongside building from bottom to top; in this shaft are housed fan units, water lines and other risers; equipment described.
15 story shaft houses conditioning rooms in modernized office building
In 17-story Merchants National Bank Building in Mobile, Ala, it was not practicable to take up valuable space for equipment; masonry shaft was built alongside building from bottom to top; in this shaft are housed fan units, water lines and other risers; equipment described.
15 story shaft houses conditioning rooms in modernized office building
Heating Vent
1940
42 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1931
|Modernized material-handling methods facilitate construction of 20-story building
Engineering Index Backfile | 1931
Two-story houses, two rooms deep, for low-income group
Engineering Index Backfile | 1932
|Corrosion problem in the modernized coal boiler houses
British Library Conference Proceedings | 2004
|Building reinforced - concrete shaft houses
Engineering Index Backfile | 1920
|