A platform for research: civil engineering, architecture and urbanism
New steel tipple built in center line of old wooden one and placed in operation with one shutdown of 45 min. (1600 w.) (80196)
New steel tipple built in center line of old wooden one and placed in operation with one shutdown of 45 min. (1600 w.) (80196)
Rebuilding a tipple
Cl Age
Raymond, Miner (author)
1917
Ills.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 2004
|Engineering Index Backfile | 1914
|Concrete in tipple construction
Engineering Index Backfile | 1928
Model steel tipple at annabelle mines
Engineering Index Backfile | 1912
|Engineering Index Backfile | 1916
|