A platform for research: civil engineering, architecture and urbanism
Concrete lock paving done first in rapid construction of Ohio river dam 35
Track ties, laid afloat, land in place as coffer is pumped. (2500 w.) (79225)
Concrete lock paving done first in rapid construction of Ohio river dam 35
Track ties, laid afloat, land in place as coffer is pumped. (2500 w.) (79225)
Concrete lock paving done first in rapid construction of Ohio river dam 35
Eng News-Rec
McAlpin, George W. (author)
1917
Ills.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of Ohio river lock and dam 12
Engineering Index Backfile | 1914
Engineering Index Backfile | 1928
Construction details of lock and dam no. 19, Ohio River
Engineering Index Backfile | 1914
Paving river-beds with concrete
Engineering Index Backfile | 1915
Engineering Index Backfile | 1927