A platform for research: civil engineering, architecture and urbanism
Bridge work on the chalco-yutan cut-off
Structure over Platte River, on C., B. and Q., involves ingenious foundation methods for a difficult situation. (1500 w.) (80313)
Bridge work on the chalco-yutan cut-off
Structure over Platte River, on C., B. and Q., involves ingenious foundation methods for a difficult situation. (1500 w.) (80313)
Bridge work on the chalco-yutan cut-off
Ry Age Gaz
1917
Map, Ills.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Nueva periferia, vieja metropoli: el Valle de Chalco
Online Contents | 1998
|BRIDGE UNDERSURFACE WORK METHOD AND POLE FOR BRIDGE UNDERSURFACE WORK
European Patent Office | 2017
|